In 2011, GRWW and the Grand Valley Metro Council received an EPA grant to conduct sediment testing in the area between the Sixth Street Dam and Ann Street. Limited sediment was found but it was tested and deemed acceptable. Of the 45 sample points, only one returned a slightly elevated level of arsenic, a commonly found element in Michigan waterways. Additional sediment samples will be collected throughout the reach of the river as designs are finalized.