Michigan Department of Natural Resources Support

Whitewater

“Michigan Department of Natural Resources Director Keith Creagh says political and funding support is there for Grand Rapids Whitewater”

Read more in the Grand Rapids Press article State support and funding is available for Grand Rapids Whitewater project, says DNR chief.

funding DNR

DNR head approves of plan to restore the rapids

“There’s one challenge about putting the rapids back into Grand Rapids, and that’s making sure that sea lampreys don’t continue up the Grand River. So they’ll go through a series of boulders and structures, and they’ll still have a lamprey control structure throughout the project. But it should increase the fisheries,” said Creagh.

WZZM 13 reports that the DNR head approves of plan to restore the rapids.

DNR
Grand Rapids WhiteWater Logo
  • The Project
  • Partners
  • Funding
  • FAQ
  • Blog
  • Donate
  • The Project
  • Partners
  • Funding
  • FAQ
  • Blog
  • Donate

Yes, I want to be in the know!

Grand Rapids WhiteWater

120 Lyon St. NW
Grand Rapids, MI 49503
contact@grandrapidswhitewater.org

© 2025 Grand Rapids WhiteWater. All rights reserved.

Facebook Instagram Linkedin Twitter Youtube

Add Rocksand Boulders

Project: Lower Reach

Area: Michigan Street to Fulton Street

Install rocks and boulders to create new wave and riffle features.

Play Video
Close

Remove Aging Dams

Project: Upper and Lower Reach

Area: Sixth Street Dam to Pearl Street

Remove four low-head dams (Lower Reach). Remove Sixth Street dam (Upper Reach) after new lamprey barrier is complete.

Sixth Street Dam to Pearl Street
Close

Reveal a Portion of the Limestone Bedrock

Project: Upper Reach

Area: Leonard Street to Sixth Street Dam

Removing the Sixth Street dam will expose a portion of the limestone bedrock that is currently submerged.
Leonard Street to Sixth Street Dam
Close

Stop InvasiveSea Lamprey

Project: Upper Reach

Area: Ann Street to Leonard Street

To protect the Grand River from invasive species, a new barrier will be installed. The Great Lakes Fishery Commission is leading the review of several options and locations, including an Adjustable Hydraulic Structure (which would look similar to this construction in Iowa).
Ann Street to Leonard Street
Close