Skip to content

Urban Waters Federal Partnership adds Legitimacy

At 2:30 p.m. today, federal officials announced that the Grand River is one of 11 locations to be added to the Urban Waters Federal Partnership “to restore waterways, help local economies, create jobs and protect Americans’ health.”

The event at the Gerald R. Ford Presidential Museum included the chair of the White House Council on Environmental Quality, the acting administrator of the U.S. Environmental Protection Agency, U.S. Sen. Debbie Stabenow and officials from the U.S. departments of Interior and Agriculture.

Read the MLive article about the announcement by the Urban Waters Federal Partnership to include the Grand River.

“It gives us the legitimacy we’ve always needed to move this project along.”

Project: Lower Reach

Area: Michigan Street to Fulton Street

Install rocks and boulders to create new wave and riffle features.

Play Video

Remove Aging Dams

Project: Upper and Lower Reach

Area: Sixth Street Dam to Pearl Street

Remove four low-head dams (Lower Reach). Remove Sixth Street dam (Upper Reach) after new lamprey barrier is complete.

Sixth Street Dam to Pearl Street

Reveal a Portion of the Limestone Bedrock

Project: Upper Reach

Area: Leonard Street to Sixth Street Dam

Removing the Sixth Street dam will expose a portion of the limestone bedrock that is currently submerged.
Leonard Street to Sixth Street Dam

Project: Upper Reach

Area: Ann Street to Leonard Street

To protect the Grand River from invasive species, a new barrier will be installed. The Great Lakes Fishery Commission is leading the review of several options and locations, including an Adjustable Hydraulic Structure (which would look similar to this construction in Iowa).
Ann Street to Leonard Street