Skip to content

ProjectUpdates

A collection of news, project updates and more current information on the Grand River restoration project.

Sixth Street Dam to Pearl Street

A Grand River Poem, with regards to Dr. Seuss

Oh, how diverse our Grand River will be! Waves, riffles, runs, galore — glides, and pools, and even more! There is a difference, as you soon will know, impressing your
Read More

Perseverance and other Grand Rapids WhiteWater values

It has been a significant couple of weeks for Grand Rapids WhiteWater. The Michigan Department of Environment, Great Lakes, and Energy (EGLE) determined that, as of September 9, 2022, our
Read More

Press Coverage of EGLE Public Comments

Many thanks to our local media for coverage of the EGLE public comment period and hearing. Here are some of the stories they told: Online and Print Coverage Community members
Read More

Ciarra C. Adkins, JD Awarded the 2022 Athena Young Professional Award

Every other Wednesday from 8:00am – 10:00am, the “River Project Team” meets for a checkup on the whitewater project.  This talented and committed group of people include folks from the
Read More

Time Sensitive: We Need Your Support

Grand Rapids WhiteWater, on behalf of the City of Grand Rapids, has submitted a permit request to EGLE, the Michigan Department of Environment, Great Lakes and Energy, for work related
Read More

Lady Bird Lake: A Reclaimed Waterway Success Story in Austin, Texas

I wasn’t born in Grand Rapids. In fact, until about 9 months ago, I had never set foot in West Michigan. I mean, I graduated high school in Illinois, so
Read More

Reflections on 2020

If you have not had a chance to read Charlie Mackesy’s book The Boy, The Horse, The Fox and The Mole, I highly recommend it. Described as “a book of hope
Read More

Grand River Water Quality: Ongoing Improvements Have Created a Safer, Cleaner Waterway

Many people wonder about the quality of water in the Grand River. They wonder whether it is safe to play in, and why the water looks brown and dirty? Most
Read More

Meet the Team: Janet Korn

Janet Korn is Senior Vice President at Experience Grand Rapids and a Grand Rapids WhiteWater Board Member. During this video introduction, she discusses her support of the project and what
Read More

Project: Lower Reach

Area: Michigan Street to Fulton Street

Install rocks and boulders to create new wave and riffle features.

Play Video

Remove Aging Dams

Project: Upper and Lower Reach

Area: Sixth Street Dam to Pearl Street

Remove four low-head dams (Lower Reach). Remove Sixth Street dam (Upper Reach) after new lamprey barrier is complete.

Sixth Street Dam to Pearl Street

Reveal a Portion of the Limestone Bedrock

Project: Upper Reach

Area: Leonard Street to Sixth Street Dam

Removing the Sixth Street dam will expose a portion of the limestone bedrock that is currently submerged.
Leonard Street to Sixth Street Dam

Project: Upper Reach

Area: Ann Street to Leonard Street

To protect the Grand River from invasive species, a new barrier will be installed. The Great Lakes Fishery Commission is leading the review of several options and locations, including an Adjustable Hydraulic Structure (which would look similar to this construction in Iowa).
Ann Street to Leonard Street